Sunday, September 21, 2008

Tubes Installed, System Operating

Installed the vacuum tubes this morning. Today's is cloudy with sun breaks, so the system is cycling the pumps. Later the array should get full sun and both DHW and Heating tanks should be fully heated. The angle of the collector is optimized for a low angle winter sun, the time when the most collection capacity is needed.

No comments: